Location : Santo Domingo - Dominican Republic
Type : Track installation
Project : Tramway
Location : London - United Kingdom }
Project : RER
Location : Champagné-Poitiers - France
Type : Renewal of track equipment
Project : Conventional railway line
Location : Caen - France}
Type : Track laying
Project : A consortium led by TSO (lead contractor), Guintoli and EIFFAGE is building the southern section of the 5.5 km long track between Caen SNCF station and the new "Grace de Dieu" station, part of Caen's new tramway system.
Location : Normandie - France
Project : A 100% Multi-expertise consortium led by Guintoli, NGE GENIE CIVIL, NGE FONDATIONS, LAGARRIGUE, SIORAT, TSO, TSO SIGNALISATION, TSO CATENAIRES and SAGES RAIL has carried out the work to create a new track to connect the Amiens-Rouen and Gisors-Serqueux lines to the existing network on the Le Havre-Paris freight line.
Location : Ile-de-France - France
Type : Catenary
Project : A consortium led by TSO CATENAIRES (leader), SETEC Ferroviaire, ETF and Mobilité has won the catenary regeneration contract on RER line C, between Paris and Brétigny-sur-Orge.
Location : Dakar - Sénégal
Type : Railway track laying
Project : TSO led the reconstruction of the freight line between Dakar and Diamnioadio to enable the construction of the Regional Express Train line of Dakar.
Location : Paris - France
Type : Renewal of switches and crossings
Project : Work on the CASTOR project in central Paris has been progressing at the rate of 6 weeks every summer since 1996. TSO is involved at the beginning of each work session to remove the tracks and ballast so that the area can be prepared for special foundation works to be carried out.
Location : Cuenca - Ecuador
Location : Oloron-Bedous Saint Marie - France
Project : A consortium, led by TSO (leader), Guintoli, EHTP, NGE FONDATIONS, NGE GENIE CIVIL, AGILIS and SFERIS have carried out the regeneration work of the Oloron-Bedous railway line between the cities of Oloron-Sainte-Marie and Bedous, in the Aspe valley (Pyrénées-Atlantiques department) after more than 30 years after traffic stopped.