🇵🇦 Maintenance of the Panama metro line 1
Project
- Location
- Panama City - Panama
- Type
- Renewal of track equipment
Since the beginning of the line 1 commercial service in 2014, TSO through its local subsidiary (TCP Rail Inc.) is in charge of the preventive and corrective maintenance of the same system TSO built: track, catenary and workshop equipment.
Working every night after the last commercial train and up to early morning hours before operation resumes, TSO maintenance team inspects and completes preventive and corrective task in order to insure the safety and comfort of the circulation and to optimize the lifespan of its components.
The key figures
of the project
17 km
of ballastless double track
of ballastless double track
15 000
passengers per hour per direction
passengers per hour per direction
17 km
of rigid catenary
of rigid catenary